No. |
Title |
Author |
Year |
Report No. |
Download |
Original URL |
1 |
Efficient Simulation Method for General Assembly Systems with Material Handling Based on Aggregated Event-Scheduling |
Y. Zhao, C.-B. Yan, Q. Zhao, N. Huang, J. Li, and X. Guan |
2009.05 |
|
www.cfins.au.tsinghua. edu.cn/files/paper/TASE309_full_20091003.pdf |
|
2 |
Formulation and a Simulation Based Algorithm for Line-side Buffer Assignment Problem in Systems of General Assembly Line with Material Handling |
C.-B. Yan, Q. Zhao, N. Huang, X. Guo, and J. Li |
2010.03 |
|
www.cfins.au.tsinghua. edu.cn/files/paper/T-ASE-2009-262-full.pdf |
|
3 |
Equilibria, Stability, and Transients in Re-entrant Lines under FBFS and LBFS Dispatch and Constant Release |
M. Hassoun, S. M. Meerkov, and C.-B. Yan |
2010.10 |
CGR 10-07 |
web.eecs.umich.edu/~smm/publications/CGR10-07/Re-entrantXlinesX102010.pdf |
|
4 |
Production Lead Time Problem: Formulation and Solution for Bernoulli Serial Lines |
S. M. Meerkov and C.-B. Yan |
2013.03 |
CGR 12-04 |
web.eecs.umich.edu/~smm/publications/CGR12-04/Lead_Time_Report_FINAL_Version_032113.pdf |
|
5 |
Cellular Production Lines with Asymptotically Reliable Bernoulli Machines: Lead Time Analysis and Control |
S. M. Meerkov and C.-B. Yan |
2013.08 |
CGR 13-03 |
web.eecs.umich.edu/~smm/publications/CGR13-03/Cellular_Lines_083113.pdf |
|
6 |
Production Lead Time in Serial Lines: Evaluation, Analysis, and Control |
S. M. Meerkov and C.-B. Yan |
2014.06 |
CGR 14-03 |
web.eecs.umich.edu/~smm/publications/CGR14-03/Lead_Time_Expon_Report_CGR14-03-061614.pdf |
|
7 |
Efficiency Analysis of Series Machines under Operation-Dependent-Failures |
C.-B. Yan, Q. Zhao |
2017.05 |
|
||
8 |
Formulation and Solution Methodology for Reducing Energy Consumption in Two-Machine Bernoulli Serial Lines |
C.-B. Yan, X. Cheng, F. Gao, and X. Guan |
2020.04 |
|
Energy Consumption Optimization_Two-machine Bernoulli Line.pdf |
|
9 |
Derivatives of Key Functions w.r.t. Machine Efficiencies in Two-Machine Geometric Lines |
C.-B. Yan and L. Liu |
2020.04 |
|
|
|
10 |
A Multi-Timescale Bilinear Model for Optimization and Control of HVAC Systems with Consistency |
Z. Nie, F. Gao, and C.-B. Yan |
2020.05 |
|
||
11 |
Problem Formulation and Solution Methodology of Energy Consumption Optimization for Two-Machine Synchronous Exponential Serial Lines |
C.-B. Yan and S. Zhang |
2023.03 |
|
Energy Consumption Optimization_Two-machine Synchronous Exponential Line.pdf |
|
12 |
Problem Formulation and Solution Methodology of Energy Consumption Optimization for Two-Machine Geometric Serial Lines |
C.-B. Yan and L. Liu |
2023.09 |
|
Energy Consumption Optimization_Two-machine Geometric Line.pdf |
|
13 |
Energy Consumption Optimization for Two-Machine Bernoulli Serial Lines Processing Perishable Products |
S. Zhang, L. Liu, and C.-B. Yan |
2024.03 |
|
Energy Consumption Optimization_Two-Machine Bernoulli Line with Yield Constraint.pdf |
|