Technical Reports

 

No.

Title

Author

Year

Report No.

Download

Original URL

1

Efficient Simulation Method for General Assembly Systems with Material Handling Based on Aggregated Event-Scheduling

Y. Zhao, C.-B. Yan, Q. Zhao, N. Huang, J. Li, and X. Guan

2009.05

 

GAL Simulation.pdf

www.cfins.au.tsinghua. edu.cn/files/paper/TASE309_full_20091003.pdf

2

Formulation and a Simulation Based Algorithm for Line-side Buffer Assignment Problem in Systems of General Assembly Line with Material Handling

C.-B. Yan, Q. Zhao, N. Huang, X. Guo, and J. Li

2010.03

 

LBAP.pdf

www.cfins.au.tsinghua. edu.cn/files/paper/T-ASE-2009-262-full.pdf

3

Equilibria, Stability, and Transients in Re-entrant Lines under FBFS and LBFS Dispatch and Constant Release

M. Hassoun, S. M. Meerkov, and C.-B. Yan

2010.10

CGR 10-07

Re-entrant Lines.pdf

web.eecs.umich.edu/~smm/publications/CGR10-07/Re-entrantXlinesX102010.pdf

4

Production Lead Time Problem: Formulation and Solution for Bernoulli Serial Lines

S. M. Meerkov and C.-B. Yan

2013.03

CGR 12-04

Lead Time_Bernoulli.pdf

web.eecs.umich.edu/~smm/publications/CGR12-04/Lead_Time_Report_FINAL_Version_032113.pdf

5

Cellular Production Lines with Asymptotically Reliable Bernoulli Machines: Lead Time Analysis and Control

S. M. Meerkov and C.-B. Yan

2013.08

CGR 13-03

Lead Time_Cellular.pdf

web.eecs.umich.edu/~smm/publications/CGR13-03/Cellular_Lines_083113.pdf

6

Production Lead Time in Serial Lines: Evaluation, Analysis, and Control

S. M. Meerkov and C.-B. Yan

2014.06

CGR 14-03

Lead Time_Exponential.pdf

web.eecs.umich.edu/~smm/publications/CGR14-03/Lead_Time_Expon_Report_CGR14-03-061614.pdf

7

Efficiency Analysis of Series Machines under Operation-Dependent-Failures

C.-B. Yan, Q. Zhao

2017.05

 

Efficiency Analysis_ODF.pdf

 

8

Formulation and Solution Methodology for Reducing Energy Consumption in Two-Machine Bernoulli Serial Lines

C.-B. Yan, X. Cheng, F. Gao, and X. Guan

2020.04

 

Energy Consumption Optimization_Two-machine Bernoulli Line.pdf

9

Derivatives of Key Functions w.r.t. Machine Efficiencies in Two-Machine Geometric Lines

C.-B. Yan and L. Liu

2020.04

 

Derivatives_geometric line.pdf

10

A Multi-Timescale Bilinear Model for Optimization and Control of HVAC Systems with Consistency

Z. Nie, F. Gao, and C.-B. Yan

2020.05

 

Proof of Theorems.pdf

 

11

Problem Formulation and Solution Methodology of Energy Consumption Optimization for Two-Machine Synchronous Exponential Serial Lines

C.-B. Yan and S. Zhang

2023.03

 

Energy Consumption Optimization_Two-machine Synchronous Exponential Line.pdf

12

Problem Formulation and Solution Methodology of Energy Consumption Optimization for Two-Machine Geometric Serial Lines

C.-B. Yan and L. Liu

2023.09

Energy Consumption Optimization_Two-machine Geometric Line.pdf

 

13

Energy Consumption Optimization for Two-Machine Bernoulli Serial Lines Processing Perishable Products

S. Zhang, L. Liu, and C.-B. Yan

2024.03

Energy Consumption Optimization_Two-Machine Bernoulli Line with Yield Constraint.pdf