分享到:
LNG船BOG再液化系统论文在《Energy Conversion and Management》发表
发布者: 谭宏博 | 2016-09-29 | 517

Energy Conversion and Management 126 (2016) 875–888

Enhancement of energy performance in a boil-off gas re-liquefaction system of LNG carriers using ejectors
Hongbo Tan, Qingxuan Zhao, Nannan Sun, Yanzhong Li ⇑
Department of Refrigeration and Cryogenic Engineering, School of Energy and Power Engineering, Xi’an Jiaotong University, 28 Xianning West Road, Xi’an 710049, China

a b s t r a c t
An ejector-enhanced Liquefied Natural Gas (LNG) boil-off gas (BOG) re-liquefaction system is proposed to improve the energy efficiency of the existing system. In the new system, two ejectors are respectively used to reduce the energy loss in the expansion of the pressurized BOG and inject a part of fuel BOG into the compression system, and a recuperator is employed to recover the cold energy of the BOG exited from LNG tank. The performance improvement of the proposed system is analysed on the basis of the simulation in Aspen HYSYS. In the case of the re-liquefaction capacity of 4557.6 kg/h, the coefficient of performance (COP) and exergy efficiency can be increased by 28%, and the specific energy consumption (SEC) reduced from 0.756 to 0.59 kW h/kg(BOG) compared to the conventional BOG re-liquefaction system. Correspondingly, the power consumption of 754.1 kW is saved. This means that applying ejectors can effectively improve the energy efficiency of the existing BOG re-liquefaction system for LNG carriers.